AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |
Back to Blog
Jessie george school washington township nj10/12/2023 ![]() ![]() All other associated work as shown on the drawings and specified herein. Construction of new electrical service room partitions, doors, hardware, lighting, etc. Removal of existing panels and distribution. New electric panels, distribution gear and connections to existing. Installation of new incoming electric service, primary, secondary, transformer, etc. This work includes, but is not limited to the following: 1. The Project generally consists of replacement of the existing electrical service, switchgear, panels, and all associated work at Berkeley and Jessie F. George ES Electric Service Replacement Projects. Library Renovation - 2022 Referendum - Haworth Public Schoolsĭisclaimer: Per FKA Architects documents must be purchased in order to be an official bidder For the Berkeley ES and Jessie F. Hawk Hill Addition - 2022 Referendum - Haworth Public SchoolsĮnergy Savings Plan (ESP) through an Energy Savings Improvement Program (ESIP) K-8 Additions - 2022 Referendum - Haworth Public SchoolsĪlterations at Nurses Suite Midland SchoolĪlterations to Susan B. Gymnasium Addition - 2022 Referendum - Haworth Public Schools HVAC Upgrades of the 300 Wing at Joyce Kilmer ESīuilding Renovations at Roberge Elementary School Baldwin Demarest Elementary Schoolīerkeley Elementary School Faculty Restroom InstallationĪuditorium Renovation at Oradell Public School ![]() Renovations and Classroom Floor Tile Replacement at T. Interior Renovations at Gantner Avenue Elementary SchoolĪ.P.R. Construction of Additional Elementary School Classrooms
0 Comments
Read More
Leave a Reply. |